Saturday, April 23, 2016

"Mission Base" Driveway

Greetings in Christ.

As you may well remember, I have started the initial planning for the construction of a little "mission base", to allow me to do more media ministry; a resting place upon return from exhausting ministry trips and a place to produce future movies.

At the end of September 2015, we had closing on the purchase of a beautiful plateau where I plan to build a little house near Mibalè, Haiti. Although the land has been surveyed and paid for, the paperwork still can't be finalized because of the "political crisis" caused by postponed elections here in Haiti. Basically, I must be a resident of Haiti to own land here, but the people to sign letters and issue the residence are currently not in power. Please pray specifically that the LORD will soon put in place a mayor that can issue my missing piece of paperwork.

One of the challenges of building on the plateau is the driveway to get there. Along with the land purchase, I was granted a deeded right-of-way. But, because the folks I bought the land from had already sold some land in the middle, the right-of-way for my land was curvy; involving going up a steep cliff.

I was able to negotiate a passage with the neighbor to build my driveway straight up through his property. This involved paying a little money, but probably less then building a road up the cliff. It will also make for a safer and easier to maintain road in the years to come. I also heard (after making this deal) that there was a seasonal spring where I had previously planned to build the road. Praise the LORD for his provision of a straight-shot on good stable ground to get up to the land where I will build!

New Right-Of-Way (Yellow-Existing Road, Orange-New Passage)

With the new right-of-way, I can currently drive (4-wheel drive) to within 200-feet of my land!

Looking Down the "Driveway"

No comments:

Post a Comment